Select Page

Towers

ProlyteStructures tower systems consist of the MPT, ST and CT ground support systems.

Showing all 7 results

  • ct-tower.d51ae244

    CT Tower

    Catalog number: – Item code: 112140011 The CT tower is based on C52T mast sections. These mast sections have onesided horizontal bracing to facilitate safe and easy climbing of the towers. C52T truss is constructed of main tubes of 60 x 5 mm and diagonals of 30 x 3/48 x 3 mm. Use the CCS7 coupling system with the CCS7-704 or CCS7-703-C52T shortened spigot pin. The base section of the CT tower is similar to the ST tower; the outside dimensions and setup are the same. Extra spindles are added to the base section to absorb the extra forces resulting from the tower’s higher loading capacity. Existing ST base sections can be upgraded to accommodate CT towers on request. The CT tower uses several sleeve blocks that combine all the trusses from the S and B Series. This makes it possible to fit almost all S Series trusses to all four sides by means of bolted female CCS7 couplers. The outside dimensions of the CT sleeve block are the same as the ST sleeve block; both can be combined in one grid. The CT tower has a self-weight of 140 kg. The CT sleeve block is a fully bolted structural element, making it much stronger and more precise than conventional welded versions.

     

    Prolyte CT Tower product sheet


  • mpt-tower.0b0f9f86

    MPT Tower

    Catalog number: – Item code: 112140009 The MPT tower is based on H30V truss and employs a sleeve block that fits to any of the 30 or 40 Series trusses on all four sides by means of bolted CCS6 couplers (either male or female). In combination with an adapter plate, it is also possible to use the sleeve block with either S36R or S36V truss The MPT tower has a self-weight of 115 kg. The MPT sleeve block is a fully bolted structural element, making it much stronger and more precise than conventional welded versions. The top section and base section can facilitate the use of either a hand winch or a chain hoist. the MPT tower is cost-effective investment. You need only purchase the special parts if you wish to expand your truss system with towers.

    Download Prolyte MPT Tower product sheet


  • rigging-tower-b100rv.5028dd28

    Rigging Tower B100RV

    Catalog number: – Item code: 112140017 The heavy-duty RT-B100RV has a loading capacity of 2300 kg and a maximum lifting height of 15,95 m. The RT-B100RV is based on B100RV truss with stabilizers of H30D truss. It has a self-weight of 695 kg. The legs of the V-shaped base can be leveled by means of screw jacks, which are attached to the side of the legs. After the base is placed, the mast can be built and erected using the hinges on the base. The mast should be stabilized by means of the braces, which fix to the legs. After the system is leveled and ballast is applied, the load can be hoisted in position. The sturdy and stable RT-B100RV rigging tower is a safe and suitable solution for all sorts of settings, like outdoor events, major public gatherings, and large stadiums.

    Download Prolyte RT-B100RV product sheet


  • rigging-tower-h30v-1.f798d209

    Rigging Tower H30V

    Catalog number: – Item code: 112140012 The light-duty RT H30V has a loading capacity of 800 kg and a maximum lifting height of 7,60 m. The RT H30V is based on H30V truss with the stabilizers of 60 mm tube. It has a self-weight of 260 kg. The legs of the V-shaped base can be leveled by means of screw jacks, which are attached to the side of the legs. After the base is placed, the mast can be build and erected using the hinges on the base corner. The mast should be stabilized by means of the braces, which fix to the legs. After the system is leveled and ballast is applied, the load can be hoisted in position. Its relatively small dimensions make it suitable for a range of applications, including outdoor events, concerts, shopping malls, halls, exhibition areas and theme parks.

    Download Prolyte RT-H30V product sheet


  • rt-s36v.e534d9e6

    Rigging Tower S36V

    Catalog number: – Item code: 112140013 The medium-duty RT S36V has a loading capacity of 1000 kg and a maximum lifting height of 9,25 m. The RT S36V is based on S36V truss with stabilizers of 60 mm tube. It has a self-weight of 415 kg. The legs of the V-shaped base can be leveled by means of screw jacks, which are attached to the side of the legs. After the base is placed, the mast can be built and erected using the hinges on the base corner. The mast should be stabilized by means of the braces, which fix to the legs. After the system is leveled and ballast is applied, the load can be hoisted in position. The relatively compact dimensions make it suitable for a range of applications, including outdoor events, concerts, shopping malls, halls, exhibition areas and theme parks.

    Download Prolyte RT-S36V product sheet


  • rt-s52sv.0935893c

    Rigging Tower S52SV

    Catalog number: – Item code: 112140015

    The medium-to-heavy-duty RT-S52SV has a loading capacity of 1400 to 2900 kg and a maximum lifting height of 12,95 m (please refer to the technical specifications table for further details). The RT-S52SV is based on S52SV truss with stabilisers of H30D truss. It has a self-weight of 520 kg. The legs of the V-shaped base can be levelled by means of screw jacks, which are attached to the side of the legs. After the base is placed, the mast can be built and erected using the hinges on the base corner. The mast should be stabilised by means of the braces, which fix to the legs. After the system is levelled and ballast is applied, the load can be hoisted into position. The RT-S52SV rigging tower is the ideal solution for medium to large scale events where flexibility counts, including festivals, concerts, or other major public events. The RT-S52SV can be converted from one type to another by simply adjusting the length of the mast.


  • st-tower.53412ef8

    ST Tower

    Catalog number: – Item code: 112140010 The ST tower is based on S40T mast sections. These mast sections have one-sided horizontal bracing to facilitate safe and easy climbing of the towers, with the use of an appropriate fall protection system. The ST tower uses several sleeve blocks that combine all the trusses from the S and B Series. This makes it possible to fit any of the S Series trusses to all four sides by means of bolted female CCS7 couplers. The ST tower has a self-weight of 120 kg. The ST sleeve block is a fully bolted structural element, making it much stronger and more precise than conventional welded versions. The ST tower is a cost-effective investment. You need only purchase the special parts if you wish to expand your truss system with towers. There is a structural relation between tower length and size. Additionally, the applied load and the method of restraining the tower base also contribute to determination of the total loading capacity. All these factors must be taken into consideration when determining the allowable load and tower length.

    Prolyte ST Tower product sheet